Drivers Face Delays During Repaving Main Street

Main Street repaving in Dothan causes minor traffic delays as drivers face the long road ahead.

Early last week the Alabama Department of Transportation started a repaving project that's expected to take months.

It started at the Southeast Alabama Medical Center and has worked its way into downtown Dothan.

The construction interferes with normal traffic signal loops. They've been automated.

Things are expected to get back to normal in mid-July.


WTVY-TV 285 N Foster Street Dothan, AL 36303 334-792-3195
Gray Television, Inc. - Copyright © 2002-2014 - Designed by Gray Digital Media - Powered by Clickability 7540187 - wtvy.com/a?a=7540187